My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58363
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:39 PM
Creation date
11/20/2007 5:50:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Agency or organ <br />Task # ; 275 <br />Date : 11/242006 <br />User : TAK <br />CIRCES Cost Estimating Software <br />TRUCKfLOADER TEAM WORK <br />ization name :Colorado Division Of Reclamation, Mining And Safety <br />State :Colorado PermiVjob # : C-80-007 <br />_ County:Gunnison Abbreviation :none <br />Site :West Elk Mine Filename :0007-275 <br />sheet 1 of 2 <br />Permit or other job action :Permit Renewal RN-OS <br />Task description :Rip and remove gravel from sforage area (approved in TR-f08) <br />HOURLY EQUIPMENT COST Shift basis : ~~~~ 1 per day ~~ <br />team <br />Support equipment -Load area :Cat D9R- <br />-Dump area : NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : trucN2 Bader dozer NA NA NA <br />Utilization-machine : 99 100 50 NA NA NA <br />-Ripper attachment : NA NA 0 NA NA NA <br />Ownership cosUhour: $11.86 $21.50 $64.72 NA NA NA <br />Operating cosUhour: $41.18 $29.21 $49.42 NA NA NA <br />Ripper op. cost/hour : NA NA $0.00 NA NA NA <br />Operator cosUhour : $21.75 $32.78 $32.78 NA NA NA <br />Unit subtotals: $74.79 $83.49 $146.92 NA NA NA <br />Number of units : 5 1 1 0 0 0 <br />Group subtotals : Work : $457.44 Support : $146.92 Maintenance : $0.00 <br />Total work team cosUhour : $804-36 <br />MATERIAL QUANTITIES ~~~~ ~~~ ~ ~ ~~ ~~~ ~ ~~ ~ ~~~~ ~~ ~ ~~ ~ ~~~ ~~ <br />Initial Swell Loose <br />volume : 260 LCY factor : NA volume : 260 LCY <br />Material weight : 2,550 pounds/LCY Struck volume <br />Descr.: Gmvel • Dry Heaped volume <br />Rated payload : 35,400 pounds Average volume <br />Payload capacity : 13.88 LCY Adjusted volume': <br /> Final truck volume based on number of loader passes <br /> Wck volume atljusted to not exceed ratetl payload or heapatl v°lume <br />Loading Tool Capacity : Job Condition Correction <br />Rated capacity (nom. heaped) : 3.750 LCY Truck <br />Descr.:Loose matedal - 1"and over (85 - 90%) Altitude adj.: 1.000 <br />Bucket fill factor : 0.875 Job effciency : 0.830 <br />Adjusted bucket capacity : 3.281 LCY Net wrrection : 0.830 <br />10.00 LCY <br />12.00 LCY <br />11,00 LCY <br />12.00 LCY <br />9.84 LCY <br />Site altitude (ft.) <br />0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.