Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 246 <br />Date : 11/02/2006 <br />User: TAK <br />Agency or organization name :Colorado Division Of Mining, Reclamation And Safety <br />Permit or other job action :Permit Renewal RN-05 <br />Task description :Regrade to AOC 1.1 acres of drill pad and light-use road approved in MR-37 <br />HOURLY EQUIPMENT COST <br />State :Colorado <br />County :Gunnison <br />Site :West EIk Mine <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br /> Operating cosUhour : $98.84 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosUhour : $204.53 Total Fleet cosUhour : $204.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 918 CCY factor : 1.165 volume : 1,069 LCY <br /> <br />Source of estimated volume :Map 1, TR-102 submittal <br />Source of estimated swell factor : DRMS estimate <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 2,110.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiWday) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-r0 <br /> Push gradient : 0.97 (Cat HB) <br />Average push gradient : 2.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,700 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight 2 900 Ibs/LCY Net correction : 0.38 <br />Weight description <br />Decomoosed rock - 50% Rock. 50% Earth <br />Adjusted unit production : 807.85 LCY/hr <br />Adjusted fleet production : 807.85 LCY/hr <br />S08 TfME A180 COST <br />Fleet size : 1 Dozers) Total job time : 1.32 Hours <br />Unit cosi : $0.253 /LCY Total job cost : $271 <br />Permit/job# :C-80-007 <br />Abbreviation :none <br />Filename :0007-246 <br />