My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58363
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:39 PM
Creation date
11/20/2007 5:50:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> BULLD02ER WORK <br /> <br /> <br /> <br />PROJECT IDENTIFICATION <br />.: <. <br />,. <br />Task # : 243 State :Colorado Permitrob# : C-80-007 <br />Date : 11/022006 County :Gunnison Abbreviation :none <br />User : TAK Site : Wesf Elk Mine Filename :0007-243 <br /> <br />Agency or organization name :Colorado Division Of Mining, Reclamation And Safety <br />Permit or other job action : Permi[ Renewal RN-OS <br />Task description : Backfill/regrade parking !ot expansion <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Operating cosUhour : $98.84 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $32.78 NA <br />Total unit cosVhour : $204.53 Total fleet cosVhour : $204,53 <br />:: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,275 CCY factor : 1.165 volume : 1,485 LCY <br />Source of estimated volume :MR-317 submittal (asphalt 1.58 acres X 6 inches thick) <br />Source of estimated swell factor :CAT Handbook <br />Average push distance : 115 feet <br />Unadjusted hourly production : 1,130.6 LCY/hr <br />Operator skill : 0.75 <br />Material consistency : 0.70 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.39 <br />Altitude : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.38 <br />Source <br />Material consistency description <br />Hard to cut or frozen <br />Average push gradient : 18.00 °~ (~ <br />Average site altitude : 6,300 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />Adjusted unit production : 433.75 LCY/hr <br />Adjusted fleet production : 433.75 LCY/hr <br />JOB TIME AND COST ---- ------------~~---------- <br />Fleet size : 1 Dozers) Total job time : 3.42 Hours <br />Unit cost : $0.472 /LCY Total job cost : $700 <br />
The URL can be used to link to this page
Your browser does not support the video tag.