Laserfiche WebLink
CIRCES Cost Estimatino Software <br />Task # : 236 State :Colorado PermiUjob# : C-80-007 <br />Date : 10/37/2006 County :Gunnison Abbreviation :none <br />User : TAK Site :West Elk Mine Filename :0007-236 <br />Agency or organization name : CDRMS <br />Permit or other job action :Permit Renewal RN-05 <br />Task description :Replace topsoil from stockpile to drill pads approved in MR-306 <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Gab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br /> Operating cosUhour : $98.84 100 <br /> Ripper op. cosVhour : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosVhour : $204.53 Total fleet cosUhour : $204.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 2,500 BCY factor: 1.250 volume: 3,125 LCY <br />Source of estimated volume :Division estimate based on MR-306 submiHa! <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Jo b Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 125 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,055.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiWday) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 0.90 (CatHB) <br />Average push gradient : 5.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7, 750 feet Material weight : 0.90 (Cat HBj <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2, 550 Ibs/LCY Nek correction : 0.39 <br />Weight description <br />Eanh -Dry packed Adjusted unit production : 406.85 LCY/hr <br /> Adjusted fleet production : 406.85 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(sj Total job time : Z 68 Hours <br />Unit cost : $0.503 /LCY Total job cost : $1,571 <br />