My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58363
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:39 PM
Creation date
11/20/2007 5:50:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 201 State :Colorado PermiUjob# :C-80-QOT <br />Date : 09/202006 County :Gunnison Abbreviation :none <br />User : TAK Site :West Etk Mine Frfename :0007-201 <br />Agency or organization name :CDRMS <br />Permit or other job action : Regrade mud pits associated with MR-212 <br />Task description :Replace topsoil from stockpile to roads associated with MR-24T <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 508 <br />Basic machine : Caf D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Sem%Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 ; 3-shank ripper <br />Ownership cosf/hour <br />Operating costlhour <br />Ripper op. costthour <br />Operator cost/hour <br />Total unit cosUhour <br />Utilization <br />$72.92 NA <br />$98.84 100 <br />$0.00 0 <br />$32.78 NA <br />Data source : (CRG) <br /> <br /> <br /> <br /> <br />$204,53 Total fleet cosUhour <br />$818,13 <br />Swell Loose <br />CCY factor : 1.125 volume : 572 LCY <br />Scurce of estimated volume :Division esfimate <br />Source of estimated swell factor ; CA7 Handbook <br />HOURLY PRODlJCTION Job Condition Correction Factors Source <br />Average push distance : 75 feet <br />Unadjusted hourly production : 1,Si4.3 LCYlhr <br />Material consistency description ; <br />Consolidated stockpile <br />Average push gradient : 10.00 °6 (~ <br />Average site altitude : 6, 600 feet <br />Material weight : 1,550 Ibs/LCY <br />Weight description <br />Earth - Drv packed <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Oozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient: 1.22 <br />Alfitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.55 <br />Adjusted unit production : 833.23 LCY/hr <br />Adjusted fleet production : 3,332.92 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) Total job time : 0.17 Hours <br />Unit cost : $0.245 lLCY Total job cost : $140 <br />
The URL can be used to link to this page
Your browser does not support the video tag.