Laserfiche WebLink
CIRCES Cost Esiimating Software <br />Task # : 195 State :Colorado <br />Date : 08/31/2006 County :Gunnison <br />User : TAK Site :West Elk Mine <br />Agency or organization name : CDRMS <br />Permit or other job action :Permit F <br />Task description : Regrac <br />HOURLY EQUIPMENT COST <br />ditch DCW-7 <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG} <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Operating cosUhour : $98.84 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $204.53 Total fleet cosUhour : $$18.13 <br />,.:. ~. <br />MATERIAL QUANTITIES <br />InNial Swell Loose <br />volume : 50 BCY factor : 1.330 volume : 86 LCY <br />Source of estimated volume :Maps 54 and 97010-104 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Source <br /> Operator skill : 0.75 (av. <br />Average push distance : 400 feet Material consistency : 0.90 (Cat <br />Unadjusted hourly production : 305.6 LCY/hr Dozing method : 1.00 (gee <br /> Visibility : 1.00 (avi <br />Material consistency description : Job efficiency : 0.83 (1 shit <br />Compacted fill or embankment Spoil pile : 0.80 (1nd <br /> Push gradient : 1.00 (Cat <br />Average push gradient : 0.00 % (pos) Altitutle : 1.00 (Cat <br />Average site altitude : 6,300 feet Material weigh : 0.79 (Cat. <br /> Blade type : 1.00 (S/St <br />Material weight : 2, 900 Ibs/LCY Net correction : 0.36 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 108.59 LCYIhr <br /> Adjusted fleet production : 434.37 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozers} Total job time : 0.15 Hours <br />Unit cost : $1.883 ILCY Total job cost : $125 <br />RN-05 <br />PermiUjob# : C-80-007 <br />Abbreviation :none <br />Filename :0007-195 <br />