Laserfiche WebLink
E~~ NEC~4 <br />S Coal Compam <br />Seneca Coal Com <br />March 28, 2.007•'*~P~~~J~P1 <br />Mr. Daniel Mathews <br />Division of Reclamation, Mining and Safety <br />101 South 3rd, Suite 301 <br />Grand Junction, CO 81501 <br />RE: Seneca II-W Mine (C-82-057) Quarterly Stockpond Inspections <br />Dear Mr. Matthews: <br /> <br />Enclosed are copies of the first quarter 2007 stockpond inspections <br />for those structures at Seneca II-W which have been constructed to <br />date. Inspections for Stockponds T-1, T-2, T-3, T-5, T-18, T-20, T-22 <br />and T-24 are included. <br />Should you have any questions, please do not hesitate to call. <br />Sincerely, <br />Enclosure(s) <br />.-x. 'k~8... <br />Af'K ~ 2 2007 <br />Dims~un of Reclamation. <br />Mining and Safety <br />/ % " ~~ <br />Roy Karo <br />Reclamation Manager <br />cc. Mr. Michael Boulay <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 50203-2273 <br />P` ,,aamation, <br />~,;;,,,,,y ,,,,d Safety <br />Seneca Coal Company • P.O. Box 670 • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 . FAX (970) 276-3014 <br />