My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25703
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:22 PM
Creation date
11/20/2007 5:49:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Hydrology
Doc Date
12/12/1983
Doc Name
CERTIFICATION OF WASTEWATER TREATMENT FACILITY EAGLE MINE COMPLEX
From
EMPIRE ENERGY CORP
To
CDOH
Permit Index Doc Type
PROF POND CERTIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ENGINEERING-SCIENCE <br />10 LAKESIDE LANE DENVER. COLORADO 80212 30314'i5-4427 <br />December 10, 1982 <br />Mr. Tod Stevens <br />Empire Energy Corporation <br />6900 South Yosemite, Suite 160 <br />Englewood, Colorado 80112 <br />Sub3ect: Certification of Construction <br />Empire Energy Eagle 115 Mine Complex <br />Wastewater Treatment Facility <br />Craig, Colorado <br />Dear Mr. Stevens: <br />An inspection of the wastewater treatment facilities at Empire Energy's <br />Eagle Ii5 Mine Complex was made on Tuesday, November 23, 19Ft2 at which time <br />operational tests were performed on the pump station,aerati.on system, <br />chlorinator, discharge control and metering facility and supporting elec- <br />trical and heating and ventilation equipment. This letter is written to <br />certify substantial completion of the facility in accordance with the plans <br />and specifications approved by the Colorado State Health Department. <br />Noted in this certification are the following exceptions to the approved <br />plans and specifications: <br />1. Additional Hypalon membrane liner was installed oci the faces of <br />each cell dividing wall and attached to the bottom liner of the <br />pond. This additional liner installation provides a water tight <br />containment of each cell of the facility and reduces the poten- <br />tial of leakage from the cells of the pond. <br />2. Gravel surfacing of the facility access road and portions of the <br />top of the pond embankment was not completed becaicse of incle- <br />ment weather conditions. We understand this work will be completed <br />by Empire Energy upon improved weather conditions:; however, the <br />facility remains readily accessible by mine equipment and operating <br />personnel. <br />3. Other minor construction details which have no effect upon the <br />operation of the facility and which will be noted upon "As Built" <br />Drawings being completed by the staff of Empire Energy and the <br />Contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.