Laserfiche WebLink
<br />EXHIBIT E <br />1. Reclamation will take place as follows: <br />(a) High walls will be taken down to a 2 to 1 slope or <br />less with bulldozers and loaders. <br />(b) Leveling and replacing of overburden with loaders and <br />scrapers. <br />(c) Reseeding and fertilizing will take place with natural <br />plant cover will take place. <br />2. The land around the affected area is basically the same <br />soil type and vegation as the affected area. The land is <br />used for range land and wild life. <br />3. The proposed post mining land use will be for range land and <br />wildlife. Due diligence will be used to return the area as <br />near as feasible to its natural state. <br />4. Costilla County will continously budget in thier Road & Bridge <br />Fund the required dollar amount to affect reclamation <br />as evidenced by Costilla County Road & Bridge Fund Budget <br />(Attached). <br />