My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25693
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:21 PM
Creation date
11/20/2007 5:49:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
10/16/1997
Doc Name
2nd Qtr 1997 Inspections
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Stockpoads or Sumps <br />INSPECTOR'S NAME: B[Ly Karo <br />FACILITY CONFIGURATION: Stockpond <br />SITE NAME: T-16 <br />MINE NAME: Seneca II <br />MINE I.D. NO.: C-80-005 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />DATE: 09/24/97 <br />DATE LAST INSPECTION: 06/24 ~Q7 <br />LOCATION: sF.i,NW'x C 1 TSN R87W <br />LOCATION: 7.1 m+ SR of Hayes. CO <br />OWNER'S REP.: Rrad Brown, Gen Mqr <br />Angle of elope: 3:1 upstream, 3:1 downstream <br />*Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment slopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Soils" beneath stream or ponded water: <br />Cracks or scarps on crest: <br />Cracks or scarps on elope: <br />Sloughing or bulging on slope: <br />*Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />8. *Eroeion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: Anproximatel~ <br />11. ,~L Increase Decrease in water lave L• _ _ <br />12. Cracks, bulging, or erosion on upstream face: <br />13 <br />14 <br />Spillway erosion: <br />*Clogging <br />Spillway channels: <br />Diversion ditches: <br />Yee ~ N/A <br />Yes ~ N/A <br />Yee ~ N/A <br />Yes ~ N/A <br />Yee ~ N/A <br />Yes ® N/A <br />Yee ~ N/A <br />Yes ~ N/A <br />Yes ©o N/A <br />Yes ©o N/A <br />Yea No N/A <br />Yes ~ N/A <br />~- feet <br />~_ feet <br />Yee ~ N/A <br />Yes ® N/A <br />Yes ~ N/A <br />Yes No N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />Total = 6:] N/A <br />etc.) in the apace on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.