Laserfiche WebLink
a __ <br /> ~II II~II~II~II~I II~ <br />E~~A <br />S Coal Company Seneca Coal Company <br />October 16, 1997 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Seneca II Mine (C-80-005) Quarterly Stockpond Inspections <br />Dear Ms. Crosby: <br />Enclosed are copies of the second quarter Stockpond inspections <br />for those structures at Seneca II which have been constructed to <br />date. The 'as-built' certifications for those stockponds which <br />do not already have an existing 'as-built' report or which have <br />been modified from the original will be submitted as soon as <br />possible, once the field surveys have all been conducted this <br />year. Most of the stockponds appeared stable and acceptable. <br />Several have filled with sediment from the storms we had in <br />September. We will try to clean these stockponds out in the next <br />few weeks as the weather and ground conditions allow. <br />Should you have any questions, please do not hesitate to call. <br />Sincerely, <br />Micha "y~,'z' Alta ~ , P.E. <br />Engin er;'~ngz~lana • r <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />ocT ~. s ~9s? <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 2763707 • FAX (970) 276-3014 <br />