Laserfiche WebLink
<br /> <br />ROADABLE EWIPMEMT: sheet 2 of 2 <br />----------------- Total Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description Cost/hr (nq. hauled) Cost/hr Loat/hr <br />Reveg. equipment (tractor, etc.) f60.00 1 560.00 f60.00 <br />IIOB/DEMOB SUPPORT EW IPMENT: <br />Subtotals f60.00 560.00 <br />--------------------------- Neight Ownership Haul Rig Fleet Size Neul Trip Return Trip DOT Permit <br />Non-ROadable Eqp. Description (tons) Cost/hr Lost/hr (m. hauled) Cost/hr Cost/hr Lost/ee <br />_________________________°°____________°________________ v===== _________________- __________°______- ____=====s==== <br />Subtotals f0.00 f0.00 f0.00 <br />Total Eqp. Fleet Size Neul Trip Return Trip <br />Roedeble Eqp. Description Cost/hr (no. hauled) Lost/hr Cost/hr <br />Subtotals <br />EOUIPNENT HAUL DISTANCE 8 TIME <br />______________________________ <br />______________________________ <br />Nearest major city or town within project area region; Fort Morgan <br />Total one way travel distance = 10.0 miles. Average travel speed = <br />Job Time - Non Roedeble Equip.= N1.00 hours load Roedeble Equip.= <br />0.33 hours haul <br />1.00 hours unload <br />0.33 hours return <br />JOB COST <br />Total Mob/Demob Cost = f),417.43 <br />f0.00 f0.00 <br />30.00 nph. <br />N/A hours Load <br />0.33 hours haul <br />N/A hours unload <br />0.33 hours return <br />-------------------- <br />NOTE: Non-roedeble equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul end a one-way empty return. Roedeble equipment (no haul rip required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits ere required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) ere also required for oversize <br />equipnent hauling, and loading/unloading times oust be increased substantially for equipnmt which oust t>e <br />pertieily dismantled nor transport end reassembled at the job site. Costs for lifting equipment end other <br />support equipment needed for this work should be included in the mob/demob costs. <br />