Laserfiche WebLink
<br /> <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />RECLAMATION COST SUMMARY FORM <br />PERMIT NUMBER: M-95-030 PREPARED BY: APM <br />DATE: 6-2-95 OPERATION: Green Bros. Pit No. 2 <br />PERMIT ACTION: New 110 uermit avolication <br />TASK NO. TASK DESCRIPTION <br />1 Mobilize and demobilize equipment needed <br />for reclamation (see attached ESTIMATING <br />FORM - EQUIP. MOB./DEMOB.) <br />2 Grading down overburden stockpile (see <br />attached ESTIMATING FORM - BULLDOZER WORK) <br />3 Replacing topsoil (see attached ESTIMATING <br />FORM - SCRAPER WORK) <br />4 Ripping compacted areas (see attached <br />ESTIMATING FORM - BULLDOZER RIPPING) <br />,/ 5 Revegetation of affected areas (see <br />attached ESTIMATING FORM - REVEGETATION WORK <br />SUBTOTAL (Direct costs) <br />INDIRECT COSTS (15.8$ of SUBTOTAL) <br />COST <br />$1,417.43 <br />683.34 <br />1,138.00 <br />209.88 <br />497.00 <br />$3,945.65 <br />$ 623.41 <br />SUBTOTAL $4,569.06 <br />ADDITIONAL 5$ REQUIRED BY SB-247 $ 228.45 <br />------------------------------------------------------- <br />TOTAL $4,797.52 <br />TOTAL (ROONDED) $f~800.00 <br />