Laserfiche WebLink
<br /> <br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: LARRY , Qerc~ikc Date: tam ~ - 27 •q 2 <br /> <br />Pond Number: 9 Date Last Inspection: /D-//• yy <br /> <br />Site Name: R S RP Quarter: fiat r <br /> <br />1. Design Depth Measured From Spillway Invert 9, 0 <br />2. Design Maximum Sediment Level Measured From Spillway Inv ert 4.7 <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert (o.7S' <br /> <br />4. Water Level Measured From Spillway Invert .voN t <br /> <br />5. Discharge Through Spillway Since Last Inspection Yes ~L No <br />6. Rills and Gullies Yes ~ No <br />7. Vegetation Adequate X Yes _ No <br />8. Outlet Channel Erosion Yes X No <br />9. Animal Burrows Yes k No <br />10. Cracks Yes X No <br />11. Seepage _ Yes X No <br />12. Spillway Clogged _ Yes ?~ No <br />13. Valves Operational ~ Yes _ No <br />ADDITIONAL COMMENTS: .yo.~t <br />MAINTENANCE REQUIRED: .rie.vt <br />SPILLWAY SNVERT'j <br />- - - ~ - - - Y <br />-- 4 -- F ~ v~ p ~ q Z <br />3; °k hay W 1 <br />V <br />~ ~ W o os ~ y v ~ R ~~1 <br />