Laserfiche WebLink
~~nd Q,,,,re~r <br />r \ ~ ~~III~IIIIIIIIIIIII ~ Wy ~99~ <br />,., <br />POV~/DERHORN <br />COAL COMPANY QUARTERLY PONp INSPECTION REPORT <br />Inspector Name: ~_ ,q Rey ~e rc/~e pate: / - 2 3 • 9 2 <br /> <br />Pond Number: / Date Last Inspection: /0-//•9/ <br /> <br />Site Name: UTL - N oarN Quarter: F~,¢rt /992 <br />1. Design Depth Measured From Spillway Invert 4.25 <br />2. Design Maximum Sediment Level Measured From Spillway Invert /, g b <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 3. /0 <br />4. Water Level Measured From Spillway Invert No.y E <br /> <br />5. Discharge Through Spillway Since Last Inspection Yes X No <br />6. Ri 11 s and Gullies Yes X No <br />7. Vegetation Adequate ?' Yes No <br /> _ <br />8. Outlet Channel Erosion Yes X No <br />9. Animal Burrows Yes k. No <br />10. Cracks Yes X No <br />11. Seepage _ Yes X No <br />12. Spillway Clogged ~ Yes X No <br />13. Valves Operational NA. _ Yes _ No <br /> ADDITIONAL COMMENTS: ,Ai~,,~P <br />MAINTENANCE REQUIRED: <br />- - ¢ <br />~W o~ G <br />3 <br />SP/LGWAY SNVE <br />-~--- -' <br />~ ~ ~ Y ~ ~ C ~ <br />hay ~ W <br />~ h " ~ R ~~ti <br />