My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58241
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:32 PM
Creation date
11/20/2007 5:46:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
3/4/2002
Doc Name
Reclamation Bond Calculations
Section_Exhibit Name
Exhibit 80 Drilling Activities - MR270
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Col oredo Division of Minerals and Geol c9y <br />• ~ ^^^ESiIMATING^FORM^^^SEALING^BORE HOLE S^^^ <br />Task #: 373 Prep, hy: JRS Task Filename 0007.371 <br />Date: 29August00 Permit #:C-80-007 Mine: 4est Elk <br />Permit Action: Minor Revision 270 <br />Task Description: Seal Six Inch OriLl Hole <br /> UNIT COSTS <br /> ______=__= Drill Ve ter Fle cbed Pickup Dozer <br /> Mobile Equipment: Rig Truck Truck Truck (Cat D7H) Las[ update: 1997 (dozer) <br /> _ _ <br />Ownership Cost/hr _ ___________________ <br />= 544.18 510.39 ________ _ <br />54.86 __________ <br />f2.40 _____________ <br />536.36 __________________________ <br /> Operating Cost/hr = 538.55 514.88 57.79 55.16 545.14 <br /> Opera cor Cost/hr = 522.95 522.18 522.35 521.82 523.12 <br /> Assistant Cost/hr = 522.06 50.00 50.00 50.00 50.00 <br /> Total = 5127.74 547.45 535.00 529.38 5104.62 <br /> Materials d Supplies: Description 5/unit unit cf/unit <br /> <br /> Portland Type II Cement 59.00 90# sack 3.00 <br /> Dry Granular 8mtonite 56.00 100# sack 3.00 <br /> Surgel Ahandonment Fluid 56.00 100# sack 3.00 <br /> Otto Plug 54.35 each NA <br /> Marker 52.00 each NA <br /> <br /> ITEM! ZED TASK BREAKDOVN <br />________________________ <br />________________________ AND ASSOCIATED COSTS <br />____________________ <br />____________________ <br />BOREHOLE OR PROJECT 1.0 .: L <br />Tocat Nunber of Hales: 1 No. Plugs/Hole: 1 Avg. unit volume (cf/lf ): 0.1963 <br />Av. Depth per Xole (f t.): 1,265.00 Plug N[. (f t.): 10 iet. tem. plug vol. (cf ): 1.96 <br />Av. Diam. per Hole (in. ): 6.00 Type of Casing: PVC Remaining fill vol. (cf ): 246.42 <br />Task Item Task Description Duanti ty Unit 5/Unit Cos[ <br />Drill Rig Fill Hole 4.00 hour 5127.74 5510.96 <br />4ater Truck supply Vat er 4.00 hour ~ 547.45 5189.80 <br />Flatbed Truck Haul Equipment 4.00 hour 535.00 5140.00 <br />Pickup Truck Haul Crev 4.00 hour 529.38 5117.52 <br />Dozer <br />Cement Plug Hole 0.65 sack f9.00 55.89 <br />Bentonite ' Fill Hole 82.14 sack 56.00 5492.84 <br />Surgel <br />Octo•plug Plug 1.00 ea. 54.35 54.35 <br />Marker Mark Hole 1.00 ea. 52.00 s2.00 <br />Miscellaneous <br />• Select either bentoni[e or surgeL; not both. TOTAL DIRECT COST 51,463.36 <br />sheet 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.