Laserfiche WebLink
Colorado Division of Minerals and Geology <br />• ^^^E ST IMAiING^fORM_-^SEALING^BORE HOLES^^^ <br />Task #: 371 Prep, hy: JRS Task Filename 0007-371 <br />Date: 29AUgus 700 Permit #:C-80-007 Mine: Vest ELk <br />Permit Action: Minor Revision 270 <br />Task Descripci on: Seal AlL Four Inch Drill Holes <br />• <br />r 1 <br />L J <br />UNIT COSTS <br />_________= Drill Voter Flatbed Pickup Dozer <br />Nubile Equi Anent: Rig Truck Truck Truck (Cat D7H) Last upda te:1997 (dozer) <br />___z__________________ _____________________________________________________ ___________ __ <br />Ovnersh ip Cost/hr = 344.18 510.39 54.86 52.40 536.36 <br />Operating Cost/hr = 538.55 314.88 57.79 35.16 545.14 <br />Operator Cost/hr = 322.95 322.18 322.35 521.82 323.12 <br />Assistant Cos c/hr = 322.06 50.00 50.00 30.00 30.00 <br />Total = 5127.74 347.45 535.00 529.38 3104.62 <br />Materials 6 suppLi es: Description s/unit wit cf/unit <br />____r________-___ _____________________________ <br />Portlard Type II Cement __________ <br />f9.00 _____________ <br />90# sack __________________________ <br />3.00 <br />~ Dry Granular Bent unite 36.00 100# sack 3.00 <br /> Surgel Abandornient Fluid 56.00 100# sack ~ ~ 3.00 <br /> Otto Plug 54.35 each NA <br /> Marker 32.00 each NA <br />ITEMIZED TASK BREAKOOVN AND ASSOCIATED COSTS <br />____________________________________________ <br />BOREHOLE OR PROJECT I.D.: F, G, K, 1, P <br />Total Number of Hales: 5 No. Plugs/Hole: 1 Avg. unit volume (cf/Lf ): 0.0875 <br />Av. Depth per Hole (ft.): 1,238.60 Plug Ht. (ft.): 10 Tot. tem. plug vol. (cf ): 4.36 <br />Av. Diam. per role (in.): 4.00 Type of Casing: P9C Remaining till vol. (cf ): 536.08 <br />Task Item Task Description Ouanti [y Unit <br />_ 3/Unit <br />_ <br />_ <br />_______ Cost <br />___ _____ <br />______________ <br />Drill Rig ______________________ <br />Fill Nole _________________ _____________ <br />20.00 __________ <br />hour ______ <br />_ <br />3127.74 __ <br />52,554.80 <br />Va ter Truck supply Voter 20.00 hour 347.45 5949.00. <br />Flatbed Truck Haul Equipment 20.00 hour 335.00 5700.00 <br />Pickup Truck Haul Crev 20.00 hour 329.38 5587.60 <br />Dozer <br />Cement Plug Xole 1.45 sack 39.00 513.09 <br />Ben tonite • Fill Hole 178.69 sack 36.00 S1,OTL. 16 <br />Surgel <br />Otto-plug Plug 5.00 ee. 54.35 521.75 <br />Marker Mark Xole 5.00 ee. 32.00 510.00 <br />Miscellaneous <br />' Select either bentonite ar Surgel; not bath. TOTAL DIRECT COST 55,908.40 <br />sheet 1 of 1 <br />