My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58183
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:29 PM
Creation date
11/20/2007 5:45:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999025
IBM Index Class Name
Permit File
Doc Date
6/25/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~C E S Cost Estimating Software <br />::_--::___-.:_:__-.:___--::_:_-_::_= sheet 1 of 2 <br />D02ER COST 8 PERFORMANCE DATA WORKSHEET DATA SWRLES: <br />--------------------------------------- Base costs: Cost Reference Guide (CRG) <br />Nachine Make 8 Model: Lat D9N (1995) SEMI-UNIVERSAL Adjusted costs: Contractors Equipment Cosi Guide (CECG) <br />------------------------------ Operator costs: Colorado Contractor's Association <br />Dozer blade: Semi-Universal Labor overhead: Colorado Dept. of Transportation <br />Attachment #1: ROPS Cab Specifications: Caterpillar Performance Handbook <br />Attachment #2: 3-shank ripper <br />CRG data update: April, 1998 <br />CECG data update: December, 1997 <br />Labor data update: July, 1994 <br />BASE COSTS (CRG data) <-------------- Ownership --------------> c--------------------- Overhaul 8 Operating ---------------------•-> <br /> <--Overhaul --> <-Field Repair-> <br /> <br />__________________________ Depreciation <br />______________ CFC <br />______________ Overhead <br />__ _________ Labor <br />________ Parts Labor Parts <br />________________________ Fuel <br />_________ Lube <br />____________ Tires <br />_______ G.E.C. <br />________ <br />________ ______ __________ <br />Machine ______________ <br />519.11 ______________ <br />58.74 ____________ <br />87.29 ________ <br />85.27 ________________________ <br />518.70 56.17 515.18 _________ <br />514.37 ____________ <br />54.93 _______ <br />50.00 ________ <br />52.34 <br />Attachment #1 50.00 50.00 50.00 50.00 SO. DD 50.00 50.00 50.00 50.00 50.00 50.00 <br />Attachment #2 54.26 51.02 50.99 50.77 51.67 E1 .41 51.40 50.90 50.36 50.00 51.16 <br /> <br />COST ADJUSTMENT FACTORS (CECG data) <br /> ACQUISITION LOST BREAKDOWN <br />Factor Description Base Value Adj. Value Multiplier ~ Cost Elements (CECG) <br />= <br />-- factor <br />== <br />... Adj. Cost <br />c.... <br />o <br />::::____:::::=e=e:c:..==ec <br />Acquisition cost: c:s...cccc...: <br />5465,920 :co....ee:____ <br />5338,177 _e:__=...:e: <br />0.726 I <br />~ ==:ecc.......v:== <br />::c: <br />Base purchase price ecc. .e c <br />ee <br />5465,920 <br />Econ. life hrs.-machine: 15,350 11,500 1.335 ~ Less dealer discount 0.142 566,161 <br />-attach. #1: 11,000 11,000 1.000 ~ Plus freight 0.020 59,318 <br />-attach. #2: 8,200 8,200 1.000 ~ Plus dealer charges • 0.005 52,330 <br />Annual use hours: 2,112 1,850 1.142 ~ * estimated - ----------- <br />Mechanic's labor cost: 527.15 523.49 0.865 ~ Adjusted purchase price 5411,407 <br />Fuel cost/9a1.-gasoline: 51.23 51.23 1.000 ~ Plus taxes: Sales a 3X 0.03 512,342 <br />-diesel: 51.11 51.11 1.000 ~ SMM a2X 0.02 58,228 <br />Cube cos[: 54.37 54.37 1.000 ~ Less Lire cost EO <br />Tire Life hours: 0 0 1-000 ~ Less salvage value 0.228 593,801 <br />Tire factor: 0 0 1.000 ~ - ----------- <br />Tire cost; 50.00 50.00 1.000 ~ Net acquisition cost 5338,177 <br />ADJUSTED COSTS < -------------- Ownership ---- --------•-> <--------------------- Overhaul & Operati ng ---------------- -------> <br /> <--Overhaul --> <-Field Repair-> <br /> Depreciation CFC Overhead Labor Parts Labor Parts <br />__ <br />_ Fuel <br />__ <br />___ Lube <br />____ <br />_ Tires <br />___ <br />__ G.E.C. <br />___ <br />___ <br />_________________________ <br />Acquisition cost _______________ <br />516.96 ______________ <br />NA ___________ <br />NA ________ <br />NA _________________ <br />_____ <br />NA NA NA ____ <br />NA ____ <br />___ <br />NA __ <br />NA __ <br />NA <br />Econ.life -Dozer & ROPS 522.64 NA NA 57.03 524.96 58-24 520.26 NA NA NA NA <br />-Attach. #2 NA NA NA 51.03 52.23 81.88 51.87 NA NA NA NA <br />Annual usage 519.36 511.14 59.45 NA NA NA NA NA NA NA NA <br />Double shifts 516.98 55.57 54.73 NA NA NA NA NA NA Np NA <br />Triple shifts 515.10 53.71 53.15 NA NA NA NA NA NA NA NA <br />Mech.labor-Dozer 8 ROPS NA NA NA 56.09 NA 57.13 NA NA NA NA NA <br />-Attach. #2 NA NA NA 50.89 NA 51.63 NA NA NA NA NA <br />Fuel/lube -Dozer 8 ROPS NA NA NA NA NA NA NA 514.37 54.93 50.00 52.34 <br />-Attach. #2 NA NA NA NA NA NA NA 50.00 50.36 50.00 51.16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.