Laserfiche WebLink
• <br />ROADABLE EQUIPMENT: <br />__________________ Total Eqp <br />Machine Description Lost/hr <br />MOB/DEMOB SUPPORT EGUI PMENT: <br />--------------------------- weight Ownership <br />Non-Roadable Eqp. Description (tons) Cost/hr <br />___________________________________________________ <br />___________________________________________________ <br />Total Eqp. <br />Roadable Eqp. Description Cost/hr <br />~~ <br />fleet Size Haul Trip Return Trip <br />(no. hauled) Lost/hr Cost/hr <br />Subtotals E0.00 50.00 <br />Haul Rig Fleet Sixe <br />Cost/hr (no. hauled) <br />_____________________________ <br />Subtotals <br />Fleet Size <br />(no. hauled) <br />sheet 2 of 2 <br />Haul Trip Return Trip DDT Permit <br />Cast/hr Lost/hr Lost/ea <br />E0.00 E0.00 E0.00 <br />__--____ _________ _________ <br />Haul Trip Return Trip <br />Cost/hr Cost/hr <br />Subtotals E0.00 E0.00 <br />EQUIPMENT HAUL DISTANCE & TIME <br />Nearest major city or town within project area region: Grand Junction <br />Total one way travel distance = 5.0 miles. Average travel speed = 35.00 mph. <br />Job Time - Non Roadable Equip.= 0.50 hours load Roadable Equip.= N/A hours load <br />0.14 hours haul 0.14 hours haul <br />0.50 hours unload N/A hours unload <br />0.14 hours return 0.14 hours return <br />JOB COST <br />Total Mob/Demob Cost = E1,40b.99 <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equi Anent which must be <br />partially dismantled for transport and re-assenbled at the job site. Casts far lifting equi Anent and other <br />support equi Anent needed for this work should be included in the mob/demob costs. <br />