Laserfiche WebLink
I R C E S Cost Estimating Eof tware <br />EARTHNORK FORM - SCRAPER-ONLY NORK <br />____________________________________ <br />____________________________________ <br />Agency or organixa[ion name DMG <br />Task # 08a State Colorado Permit # M-99-025 <br />Date 06/21/99 County Mesa Abbr. none <br />User SSS Site Soaring Eagle GraveFilename M023-08a <br />Permit/job action New 112C Application <br />Task description Apply topsoil around Phase V lake perimeter <br />HOURLY EQUIPMENT COST <br />_____________________ Model Cat 633E Shift basis 1/day <br />Cost Breakdown ----------------------------- --------- <br />-------------- Utilization X Horsepower ; 475 <br />Ownership cost/hour E67.68 NA ~ --------- <br />Operating cos[/hour E105.27 100 Neight (UST): 56.00 <br />Operator cost/hour E23.3D NA --------- <br /> _________ (CRC) <br />Total unit cos [(hour: 8196.26 Total fleet costlhr: E196.26 <br />MATERIAL QUANTITIES <br />___________________ <br />Initial Swell Loose <br />volume 1,314 LCY factor NA volume 1,314 LCY <br />Source of quantity take-off 3400' of shore covered w/avg. 7" of topsoil <br />Source of est. swell factor NA <br />HOURLY PRODUCTION <br />Hauling Capacity (weight vs. volume basis) <br />Material type & wt. 2,100 lbs/LCY ~ Struck volume NA LCY <br />Earth - Loam ~ Heaped volume 34.00 LCY <br />--------------------- ------------------ I Average volume 34.00 LCY <br />Rated payload 82,000 lbs. ~ --- ---------- <br />Payload capacity 39.05 LCY ~ Adjusted volume 34.00 LCY *** <br />Cycle Time Loading••••••••••• ••-•••••..........: 0.90 min. * <br />---------- Maneuver 8 spread . ..................: 0.70 min. <br /> * load ti me/pair on push-pull models --- ---------- <br />Travel: Distance(ft) Grade X R. Res. Y. Total R.X Vel.(fpm) <br />Haul 900 0.0 5.0 5.0 1,243 0.87 min. ** <br />Return: 900 0.0 5.0 5.0 2,124 0.67 min. ** <br />** adj- for accelerat ion/deceleration Total cycle time 3.15 min. <br />Job Condition Correct ion Factors --- ---------- <br />Site altitude (ft) 4,490 Adjusted Hourly Production <br />Altitude adjustment 1.00 (CAT HB) ----------------------- --- <br />Job efficiency fctr.: 0.83 (1 s/d) Unadj. unit prod. 648.38 LCY/Hr*** <br /> --------- Adj. unit prod. 538.15 LCYJHr <br />Net job correction 0.83 Adj. fleet prod. 538.15 LCY/Hr <br /> -°------ **r 2x vo L on p'P's --- '--------- <br />JOB COST Fleet size 1 Scraper(s) Total job time 2.44 Hours <br />Unit cost E0.365 /LCY Total job cost E479 <br />