My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25641
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25641
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:19 PM
Creation date
11/20/2007 5:45:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Hydrology
Doc Date
2/20/1992
Doc Name
4TH QTR 1991 IMPOUNDMENT Reports
From
WYOMING FUEL CO
To
MLRD
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WYOMING FUEt COMPANY <br />SEDIMENT POND INSPECTION FORM <br />l /~D /~ <br />Pondr~,r("~ ~~irt- rrlp NPDES No. G~~~_ <br />Date of Inspection / 1-~~/ y,~ //'' <br />• EMI3ANKMENT ~~~ (,S ~~~.~fij(~~' <br />1. Evaluate the adequacy of the vegetative cover; Excellent, Moderate, Spotty, Poor. <br />2. Are erosion-formed gullies present? Extensive, Some, Very Few, None. <br />3. is wave action causing erosion: On the upstream embankment? Yes__ No <br />At the principal spillway inlet? Yes No <br />- -- 4. Is t.`te downstream toe of the embankment being eroded? Yes No•^ The <br />- causr of erosion is attributed to: Explain <br />S. is seepage occvring through the dam? Yes NFo L` yes could this seepage <br />potentially eau/se slops instabili/Jty? Yts~ No E,xQplain~ <br />Pli1G n [~ .i ~ /, l~ r.f 'ola.1~. . ~,~yi(~V ~ / C~yl~ <br />PRINCIPAL SPILLWAY ! <br />_ _- 1. Is tltc overall principal spillway system in good working order? Yes,__ No <br />1. !s the inlet free of debris or other restrictive materials? Yes tdo _ <br />~.-~ 3. Is the discharge outlet free of debris at other restrictive materials? Yes_ No_ <br />4. is erosion occurring at the discharge outlet? Yes No IS yes, evaluate the <br />severity: Extensive, Moderate, Just Starting, None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system currently capable o! passing cksign storm <br />discharge? Yes No , <br />2. Does it appear as if the emergency spillway has discharged water since the last <br />inspection? Yes No <br />3. is erosion occurring at any section of the emergency spillway? Yes No <br />Describe extent and location: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design sr'ir~ent s:orage capacity of the reservoir been surpasse!? Yes' <br />No If yes, explain <br />Pleas.^. add any special comments concerning potentially dangerous problr_ms en the bzck <br />of this sheet. <br />Inspector ~~~~ ti----' <br />-~- <br />'::.., <br />
The URL can be used to link to this page
Your browser does not support the video tag.