My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58182
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:29 PM
Creation date
11/20/2007 5:45:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
ENGINEERING GEOLOGIC GROUND STABILITY INVESTIGATIONS 005 GULCH AND VICINITY
Section_Exhibit Name
TAB 13 ATTACHMENT 13-3B
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AMUEDO AND IVEY <br />WORLDWIDE GEOLOGICAL CONSULTANTS <br />1660 5 AL BION STREET <br />SUITE 829 <br />DENVE R. COLORADO 80222 <br />TEL ]03/158-123t <br />FAX. 30J1156~6155 <br />PETROLEUM AND MINERAL <br />E%PLORATION <br />March 6, 1992 <br /> <br />Mr. T.J. Wainwright, P.E. <br />Senior Engineer <br />Peabody Coal Company <br />Western Division <br />1300 So. Yale <br />Flagstaff, AZ 86001 <br />Dear Mr. Wainwright: <br />,. <br />~: <br />r , ~ ~ ~, <br />3^a <br />EsbblisMO 1951 <br />ENGINEERING GEOLOGY <br />AND PMOTOGEOLOGY <br />This letter transmits our report, "Engineering Geologic Ground Stability <br />Investigations, 005 Gulch and Vicinity, Seneca II-W Mine Area, Routt County, <br />Colorado." <br />The report and accompanying maps describe our findings with respect to <br />ground stability in the 005 Gulch and vicinity which are part of Peabody Coal <br />Company's Seneca II-W mine complex. <br />The proposed Sedimentation Pond is in a geologically sound site, although <br />it is not as close to the mine as was preferred. <br />The proposed Haul Road G alignment of necessity traverses some undesirable <br />ground; however, the options for realignment do not appear to overrule the <br />present alignment. In view of the unstable ground traversed by part of the <br />alignment, it is probable that the cost of maintenance will be higher for this <br />road than would otherwise be the case. <br />If during the design and construction efforts you make any significant <br />departures from what is presented in the report, it will be advisable to gain <br />further geologic inputs. <br />It has been a pleasure to work with you on this project and I wish you <br />well in its ultimate development. <br />Sincerely, <br />AMUEDO AND IVEY, INC. <br />• <br />J n Ivey <br />Vice President <br />JBI/cw <br />INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.