Laserfiche WebLink
EXHIBIT L <br /> RECLAMATION COSTS <br /> Summary of Reclamation Costs <br /> Major Disturbance $23,078.00 <br /> Moderate Disturbance $ 7,350.00 <br /> Minor Disturbance $ 1100. 00 <br /> TOTAL RECLAMATION COSTS $31,528.00 <br /> Proposed Reclamation Bond $31,550.00 <br /> Bonded Cost Per Acre $ 1,288.00 <br /> Maior Disturbance <br /> ---------------------------------------------------------------- <br /> Unit Total <br /> No. Item Unit Quantity Price Price <br /> ----------------------------------------------------------------- <br /> 1 Backfill Shoreline Overburden C.Y. 4000 $1.00 $4,000.00 <br /> 2 Backfill Shoreline Topsoil C.Y. 2000 $1.00 $2 ,000.00 <br /> 3 Redistribute Topsoil to Strip C.Y. 6453 $1 .00 $6,453.00 <br /> 4 Scarify Compacted Areas Acre 5. 0 $725.00 $3, 625.00 <br /> 5 Seed, Fertilize, Mulch Acre 14 .0 $500. 00 $7, 000.00 <br /> ------------------------------------------------------------------ <br /> TOTAL. . . . . . . . . . . . . . .$23, 078. 00 <br /> NOTES/DESCRIPTION: <br /> Backfill Shoreline Overburden 1 .2 acres (of 6 acres mining major <br /> disturbance) = 35 foot slope <br /> distance x 1533 feet proposed <br /> shoreline at 2 foot depth. <br /> Backfill Shoreline Topsoil 1 .2 acres (of 6 acres mining <br /> major disturbance) = 35 foot slope <br /> distance x 1533 feet proposed <br /> shoreline at 1 foot depth. <br /> Redistribute Topsoil to Strip 8.0 acres stripped to 6 inch depth. <br /> Scarify Compacted Areas 1 .0 acre topsoil stockpiles and <br /> 4.0 acres overburden stockpiles. <br /> Seed, Fertilize, Mulch 1.2 acres mining, 1.0 acres <br /> topsoil stockpiles, 4 .0 acres <br /> overburden stockpiles, 3.0 acres <br /> stripped area. <br /> L-1 <br />