Laserfiche WebLink
The grading will be done to control erosion. Final grading and <br /> reseeding will be done as soon as possible after grading and <br /> topsoiling has been done. All backfilling will be completed in <br /> phases after mining is completed. <br /> No acid forming materials, refuse, or toxic producing materials are <br /> known to exist in the area and will not be used for reclamation. <br /> Any materials of this nature found during the mining operation will <br /> be disposed of according to applicable laws. <br /> There are no drill or auger holes associated with the mining <br /> operation. <br /> All slopes created by the mining operation will be no greater than <br /> 3: 1 . One area along the east edge will be used as a swimming <br /> beach. This area will be mined at 5:1 for a distance of <br /> approximately 200 feet. <br /> Water <br /> Disturbance of the area will be done to minimize the affect on the <br /> prevailing hydrologic balance as follows: <br /> (a) The operator shall comply with all applicable Colorado <br /> water laws. <br /> (b) The operator shall comply with all applicable Federal and <br /> State water quality laws and regulations. <br /> (c) The operator shall comply with all Federal and State <br /> requirements for dredge and fill. There are no <br /> anticipated requirements for this type of activity. <br /> Wildlife <br /> The proposed reclamation plan does not propose to create wildlife <br /> habitat. There are no known endangered species in the area. All <br /> activities will be planned considering the safety and protection of <br /> wildlife on the property. Some species may be temporarily <br /> displaced by the mining activities. They are expected to re- <br /> establish with no difficulty after mining and reclamation has been <br /> completed. <br /> Topsoiling <br /> All topsoil will be stripped prior to mining and stockpiled. <br /> Stockpiles which remain in place longer than one growing season <br /> will be seeded with a fast growing cover to minimize erosion. <br /> Handling of topsoil will be minimized by efficient sequencing of <br /> mining and reclamation through phases. <br /> E-2 <br />