Laserfiche WebLink
HASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond (JO(,~Q,., GL~,~,~. f%/i2~ NPDES No._ GY~~/ <br />Date of Inspection l2-~/~~9Z <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: xcell~ Moda~rate, Few, Poor <br />2. Erosion forming gullies: Extensive, Some, ~ ery Few None <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yea No ~ <br />At the principal spillway inlet? Yes No~ <br />4. Erosion of the downstream toe of the embankment? Yea No ~ <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yea No~L If yes <br />could this seepage cause potential instability? Yes No <br />Explain• <br />PRINCIPAL SPILLWAY <br />1. is the principal spillway system in working order? Yes ~No <br />2. Is the inlet free of debris and restrictive material?Yes ~/No <br />3. is the discharge outlet free of restrictive material? Yes~No <br />4.' Is erosion occurring at the discharge outlet? Yea__No y If <br />yes, <br />evaluate the severity: Extensive Moderate Just starting None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spill ag system capable of passing <br />design storm discharge? Yes r/~ No <br />2. Does it appear as if the emergency spillway has discharged water <br />since the last inspection? Yes No ~ <br />3. Is erosion occur;inq at any section of the emergency spillway? <br />Yes No / Describe the <br />extent <br />SEDIMENT STORAGE CAPACITY <br />1. Has the designs rage capacity of the reservoir been surpassed? <br />Yes No~f yea, <br />explain• <br />Please add any special comments concerning potentially dangerous <br />problems on the back of this sheet. <br />Inspector ~~~ <br />