Laserfiche WebLink
HASIN RESOURCES, INC. <br />iTATION POND iNSPECT2AN gp(~( <br />No . OO Z~ <br />Date of Inspection f Z~QZ <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: :cellen Moderate, Few, Poor <br />2. Erosion forming gullies: Extensive, Some, ~ ery Few, None <br />3. Ia wave nction causing erosion: <br />On the upstream embankment? Yes• No y <br />At the principal spillway inlet? Yea No ~ <br />4. Erosion of the downstream toe of the embankment? Yes No C/ <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yea No ~~ If yes <br />could this seepage cause potential instability? Yes No <br />Explain: <br />PRINCIPAL SPILLWAY <br />1. Is the principal spillway system in working order? Yes do <br />2. Is the inlet free of debris and restrictive material?Yes~No <br />3. Is the discharge outlet free of restrictive material? Yea r/No_ <br />4. Is erosion occurring at the discharge outlet? Yes__No_~/If <br />yes, <br />evaluate the severity: Extensive Moderate Just starting None <br />EMERGENCY SPILLWAY <br />1. is the overall emergency spillway system capable of passing <br />design storm discharge? Yes~~No <br />2. Does it appear as if the emergency spillw~ has discharged water <br />since the last inspection? Yea No r/ <br />3. is erosion occurring nt any section of the emergency spillway? <br />Yes Nom/ Describe the <br />extent <br />SEDIMENT STORAGE CAPACITY <br />1. Has the desiq~orage capacity of the reservoir been surpassed? <br />Yes No I! yea, <br />explain: <br />Please add any special comments concerning potentially dangerous <br />problems on the back of this sheet. <br />Inspector ~°~~ <br />