My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58172
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:29 PM
Creation date
11/20/2007 5:44:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
6/28/2005
Section_Exhibit Name
Appendix W 2004 Report Section 3.0 to 7.0
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6.0 Stock Tank and Dozer Basin Construction Through 2004. <br />6.1 Stock Tanks <br />This section updates the location of all constructed stock tanks through 2004 (Map 1). The average <br />tank density for Trapper mined-land areas will not exceed one tank per ten acres. F~cisting stock tanks <br />meet applicable certification standards. <br />Stock ponds located in approved SL-4 Phase III Bond Release areas are no longer inGuded on the <br />annual reGamation maps. <br />6.2 Dozer Basins <br />As a result of the approval of technical revision TR-73 (January 1997), dozer basin locations will be <br />provided in this Appendix W document on an annual basis (Map 1). <br />Dozer basins assist sediment impoundments in the containment of sediment, reducing the frequency of <br />sediment impoundment Leaning. Dozer basins are typically constructed along haulroads, regraded <br />spoils, and/or on short or long term disturbed sites. <br /> <br />FMS 305 <br />rDMG~OCPON01elBOr <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.