PROPOSED STIPULATIONS: <br />• The fill section of the access road will be constructed as a mechanically reinforced embankment <br />as shown in the preliminary access road designs dated August 31, 2005. <br />• The cut section of the access road will be constructed and reinforced in accordance with the <br />retaining structure and subsurface drain system recommendations contained in the Trautner <br />Report dated October 21, 200. <br />• The access road will be constructed in accordance with the construction recommendations <br />contained in Section 8 of the Trautner Report dated October 21, 2005. <br />• The DMG shall be provided a general schedule for construction of the road to facilitate <br />scheduling of site inspections. The general schedule must be provided at least 30-days prior to <br />initiation of road construction. <br />• No more than 60-days following completion of road construction, the DMG will be provided <br />with an as-built construction report and as-built drawings detailing all aspects of how the road <br />was constructed. <br />