Laserfiche WebLink
w • -6 • <br />5N <br />Exhibit F <br />As noted in the first paragraph of this letter, we expect to <br />secure favorable approval from Fremont County on April 22nd. <br />Con^lusion <br />The operator is willing to accommodate reasonable modifications <br />to the mining plan in terms of bench design and related matters. <br />Further, we want to carry out suitable modifications r_o the <br />reclamation plan to assure success in the tree planting effort. <br />By the same spirit, we believe restoration on barren rocky <br />slopes i_s not practical and should not be required beyond <br />reasonable shaping and clean-up during the course of mining. <br />Instead, we believe our limited topsoil resources should be <br />concentrated to provide the necessary root medium and water <br />retention capability not now available on the lower stockpile <br />areas. <br />Thank you for your continued assistance in developing a work- <br />able mining and reclamation plan. <br />Si c•er~ly <br />D-+~_ <br />Don ld`A.\ Consultant <br />P.S. This letter has the full concurrance of C & C Sand Company. <br />