Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-I 12 <br />November 2004 Monthly Repor[ <br />Page 3 <br />Table 2 -November 2004 Tailing Disposal Area Piezometer Depth to Water <br />Measurements <br />Piezometer Date Depth to Water <br />feet Total Depth (fr) Volame of <br />Water ft <br />P6 11/29/04 D 72.46 0.00 <br />P7 11/29/04 92.29 92.50 0.21 <br />P8 11/29/04 96.79 97.51 0.72 <br />P9 11/29/04 71.74 72.30 0.56 <br />PIO 11/29/04 57.42 58.30 0.88 <br />PI1 11/29/04 41.21 41.80 0.59 <br />P12 11/29/04 41.62 41.71 0.09 <br />P13 11/29/04 41.01 41.34 0.33 <br />P14 11/29/04 D 41.24 0.00 <br />P15 1129/04 D 41.10 0.00 <br />Water Treatment Plant Sludge Mana¢ement Yeaz to Date <br />DATE QUANTITY MANAGEMENT <br />April 2004 157.5 tons? Sludge transferced from Water Treatment Plant <br /> Pond 3 to drying pad. Pond 3 cleaning. <br />July 2004 70 Tons Sludge transferred from drying pad to tailings j <br /> impoundment. ', <br />August 2004 87.5 Tons Sludge transferred from drying pad to tailings ~ <br /> impoundment. <br />October 2004 150 ton (estimated) Sludge transferced from Water Treatment Plant <br /> Pond 3 to drying pad. Pond 3 cleaning. <br />October 2004 37.5 Tons Sludge transferced from old pond #2 to tailings <br /> impoundment. <br />The San Luis Mill facility structure and Crusher (i.e. sheet metal, steel beams, CIL tanks, etc.) <br />have been completely dismantled and taken off site. According to discussions with the mill <br />demolition contractor plans to remove the remaining mill foundation and mill cinder block <br />electrical room structure during 1" or 2°d quarter 2005 depending on weather conditions. <br />