Laserfiche WebLink
. . <br />u <br />- i III IIIIIIIIIIIII III <br />~~ 9~~ ~ ~F COLORP~DO <br />Roy Romer, Governor <br />Patti Shwayder, Atting Executive Director <br />Dedicated to protecting and improving the health and environment o(the people of Colorado <br />4300 Cherry Creek Dr. S. Laboratory Building <br />Denver, Colorado 80222-7570 4270 E. 11th Avenue <br />Phone (307) 692-2000 Denver, Colorado 80220.3776 <br />(303) 691-0700 <br />FP cE~~~o <br />2 <br />°F. epr0 <br />ti~ 9 <br />Hc~ ~~ <br />• Q~ r <br />a a <br />Colorado Department <br />of Public Health <br />and Environment <br />Ms. Nancy A. Comer-Baker, Office Manager ~;~; . S 199S <br />M & M Mining srOry °(Mir <br />FairplBayXC08 80440-0388 rerars ~ G~0lc9y <br />Certified Mail No. P 221 569 302 <br />Re: Stormwater Management Requirements <br />Snow Bird Mine, CDPS Permit Certification Number COG-370012 , <br />Park County <br />September 20, 1995 <br />Dear Ms. Comer-Baker, <br />The Water Quality Control Division (the Division) has received a complaint that Stormwater runoff <br />from your operation maybe causing a water quality problem, specifically with regard to spilled <br />diesel fuel. As a first step in investigating this allegation, we would like to review the Stormwater <br />Management Plan (SWMP) for the Snow Bird Mine. <br />Your Colorado Discharge Permit System (CDPS) permit, referenced above, includes a requirement to <br />control Stormwater discharges associated with mining activities at your site. The primary Stormwater <br />requirement is that you develop and implement a SWMP (see section I.D. of the permit on page 5). <br />The contents of the SWMP are specified in the petmit (see pages 6 and 7) I have enclosed a copy of <br />the general permit for your reference. <br />Section I.D.4. states that this SWMP must be provided to the Division upon request, within the time <br />frame specified in the request. This letter is a formal request for submittal of the Snow Bird Mine <br />SWMP. Please submit your SWMP to this office by October 13, 1995. <br />After review of the SWMP, we will contact you to schedule an inspection of the site. <br />