Laserfiche WebLink
II. Control o° `faterials Handling <br />• © A. Loadout to grizzly, stockpile, or for final transport (describe <br />Loadout) Loadout to stockpile via truck end diyy~ <br />1. Fu11 enclosure (describe) <br />_ ~2, Partial enclosure (describe) <br />~3. Chemical stabilizers (describe) <br />* ~ 4, Water spray (describe method 6 rate of application <br />~5. Negative pressure with fabric filter <br />~6. Stacker-height adjustable <br />~7. Telescoping chute <br />~8. No control <br />List all other loadouts, describe method and control methodology Loadout of <br />stockpile to overland conveyor via front end loader dumoin0 nn Qr;~~ty_ <br />® B. Conveying and transfer points <br />• ~1. Totally enclosed with negative pressure to a bagfilter, <br />2, Totally enclosed with water spray or chemical stabilizers <br />(circle one) <br />3. Totally enclosed. <br />4, Partially enclosed with water spray or chemical stabilizers <br />(circle one) <br />O 5. Partially enclosed. <br />* ~ 6. Open with water spray or chemical stabilizers (circle one) <br />~1, No control <br />List all other conveyors and transfer points if control methodology checked <br />above does not apply to all operations <br />• <br />Page 3 <br />