My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58063
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:23 PM
Creation date
11/20/2007 5:40:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
TAB 15 PERMIT RENEWAL, 1986
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C RESPONS[: <br />The Wolf Creek linear Swale, as with other areas on the mine site (and <br />as occurs in natural conditions), may develop unforseen rills and <br />gullies. Iri the course of monitoring and reporting of excessive rills <br />and gullies as described on revised Pages 13-9a through 13-9c, Peabody <br />will initiate the appropriate action to alleviate the problem. Based on <br />field trials, it is anticipated that rock check dams in the area <br />exhibiting armouring or similar control types will be the primary and <br />most efier_tive means of controlling excessive gullies. This method will <br />slow the rate of runoff while retaining eroded materials. As these <br />check clams successfully control the erosion, topsoilirtg and reseeding <br />may aeain be performed to further stabilize the area. This type of <br />approach can be applied to other reclaimed areas as necessary. <br />The rill and gully plan in Tab 13, Page 9b is revised to reflect the <br />above discussion. <br />C COh~h1EfJ I <br />D. Auger Areas B & D <br />Table 12-5 of tfte revised permit renewal application indicates that <br />reclamation of the 33.6-acre Auger B area will not be completed <br />until 1987. As such, the estimated cost of completing the <br />reclainatiori plan for this area needs to be added into the <br />reclamation cost estimate. Page 12-12 of the revised application <br />indicates that Auger Area D is "currently in the final stages of <br />reclamation". Unless this area will be completely reclaimed prior <br />to the date of permit renewal (November 24, 1986), the estimated <br />cost for completing the reclamation plan for this area needs to be <br />added into the reclamation cost estimate. <br />PESPOPISE: <br />Auger Area D will be reclaimed by November 24, 19£6. <br />• <br />• <br />Auger Area B was not included in the bonding calculations. Currently, <br />the required reclamation grading is approximately five acres. The • <br />reinainclr.r of the disturbance requires topsoil and revegetation. As <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.