Laserfiche WebLink
dozer movement of material in <br />reclamation. <br />4. Facilities Removal <br />RESPONSE: <br />conjunction with sediment pond <br />Table 13-7, Facilities-Quantity, has been added to Attachment 13-1. <br />This table quantifies the square footage and cubic footage of <br />facilities which must be removed for final reclamation. Revised Pages <br />13-58 and 13-58a-b detail removal costs. <br />5. Revegetation <br />RESPONSE: <br />Revised Page 13-61 assumes a 25 percent revegetation failure. <br />6. hiiscellaneous Project Costs <br />n <br />U <br /> <br />RESPONSE: <br />Miscellaneous project costs, including stream channel reconstruction, <br />ephemeral channel establishment, drill hole sealing, flood lights and <br />postmining topography verification have been added as sho~~an on Page <br />13-62. <br />The summary of total reelaniation costs, detailed en revised Page 13-63 <br />adds an additional 4.25 percent of direct costs (totaling $176,285) for <br />final engineering work and 58,400 for Ci9LRD administrative expense. <br />43 Revised 8/27/86 <br />