Laserfiche WebLink
Exhibit B <br />LIST OF STIPULATIONS <br />• Stipulations 1, 2, 3 and 5 below were part of the original permit, approved <br />September 23, 1981, and will be carried into the new permit term. Stipulation <br />number 4 was issued as part of the Wolf Creek Permit Revision (September 25, <br />1984). One new stipulation was attached to the permit during the renewal <br />process, which relates to reclamation bond submittal and amount. All <br />stipulations will become a binding part of the permit upon final issuance. <br />1. IF DURING 7HE COURSE OF MINING OPERATIONS, PREVIOUSLY UNIDENTIFIED <br />CULTURAL RESOURCES ARE DISCOVERED, THE PERMITTEE SHALL INSURE THAT THE <br />SITE IS NOT DISTURBED AND SHALL IIOTIFY THE COLORADO MINED LAUD <br />RECLAFIATI011 DIVISION) AND THE UNITED STATES OFFICE OF SURFACE MIIJING <br />(OSM). THE PERMITTEE SHALL INSURE THAT THE RESOURCE IS PROPERLY <br />EVALUATED IN TERMS OF THE NATIONAL HISTORIC PLACES ELIGIBILITY CRITERIA <br />(36 CFR 60.61). SHOULD A RESOURCE BE DETERMINED ELIGIBLE FOR LISTING 01! <br />THE NATIONAL REGISTER, APPROPRIATE MITIGATION MEASURES WILL BE DEVELOPED <br />AND IMPLEI.IENTED IN CONSULTATION WITH THE STATE HISTORIC PRESERVATION <br />OFFICER (SHPO), THE BUREAU OF LANO MANAGEMENT (BLM), THE OFFICE OF <br />SURFACE MINING (OSM), AND THE MINED LAND RECLAFIATION DIVISION (MLRD). <br />2 WITHIN 90 DAYS OF ITS PUBLICATION, A COPY OF THE UIJITED STATES GEOLOGICAL <br />SURVEY'S LYSIMETER STUDY MUST BE SENT TO THE DIVISION ANJD OS14 TO PROVIDE <br />ADDITIONAL QUANTITATIVE DATA ON FLOW RATES AND WATER QUALITY OF THE SPOIL <br />LEACHATE. <br />• 3. A LIST OF PROPOSED SEED MIXTURES h1UST BE SUBMITTED ANNIUALLY TO THE <br />DIVISION FOR REVIEIJ AND APPROVAL. THE LIST SHOULD INCLUDE PURE LIVE SEED <br />(PLS) PER SQUARE FOOT, POUNDS PLS PER ACRE, SPECIES ORIGIN, AND ACRE <br />ESTIh1ATES TO BE SEEDED FOR EACH MIX. <br />4. A QUALIFIED REGISTERED ENGINEER SHALL PERFORM INSPECTIONS AT LEAST <br />BIMONTHLY DURING THE CONJSTRUCTION AND PLACEI4ENT OF THE UNDERDRAIN (AT THE <br />WOLF CREEK FILL). RECORDS OF THE INSPECTIONS ARE TO INCLUDE DATE, TIME, <br />INSPECTOR AND OBSERVATION. COPIES SHALL BE RETAINED AT THE MINE SITE, <br />AFTER COMPLETION OF THE UIIDERDRAIN CONSTRUCTION, COPIES OF THESE <br />INSPECTION REPORTS SHALL BE 5EN7 TO THE DIVISION. <br />5. THE 110 FOOT FILL EFiBANKMENT ON THE VAIN HAUL ROAD MUST BE INSPECTED <br />ANNUALLY, OR IJITHIN 10 DAYS FOLLOWING ANY STOR14 WHOSE BACKWATER ELEVATION <br />EXCEEDS THE ELEVATION OF 6941,1 FEET A80VE SEA LEVEL (10-YEAR, 24-HOUR <br />MAXIJ•fUM STORM EVENT'S PROJECTED BACKWATER ELEVATION)) BY A QUALIFIED <br />GEOTECHIIICAL ENGINEER OR ENGINEERING GEOLOGIST. A LETTER OF <br />CERTIFICATION CONTAINING THE RESULTS MUS7 BE SUBMITTED TO THE DIVISION <br />WITHIN 2 WEEKS FOLLOWINJG 7HE INSPECTIONS. <br />A PERFORMANCE BONJD IN THE AMOUNT OF 56,431,188.00, PAYABLE TO THE STATE <br />OF COLORADO AND THE UIJITED STATES OF AMERICA, MUST 8E FILED iJITH THE <br />DIVISION WITHIN FIVE DAYS AFTER THE DECISION BEC014ES FINAL. <br />• <br />