RECLAMATION COSTS <br />EDIT L <br />The worst case reclamation scenario will occur at the end of the mine life. At this point, there <br />will be two different areas which will have to be reclaimed; which will be the largest disturbance <br />at any time. These two azeas include Phase 12, and the staging area which will be built on the <br />peninsula which was created with backfilled material in Phase 10 of the mining plan. All areas <br />will have to be ripped, retopsoiled, harrowed and graded, and finally seeded. The total inclusion <br />area to be reclaimed in the worst case scenario is 15.14 acres. If for any reason mining ceased in <br />an area where a peninsula was to be built and the peninsula has not been created yet, it will not <br />be included in the reclamation in order to decrease the liability. A breakdown of all costs <br />associated can be seen in the table below: <br />Task # Descri tion Time (da s Cost <br />1 Removal of all ortable facilities 3 $0 <br /> Backfi1140,000 cy in Phase 12 from TS stockpile <br />2 with a scra er. Cost = $0.50/c 30 $20,000 <br /> Rip to a depth of 2.0 feet all areas prior to topsoiling. <br />3 Cost = $250/acre for 7 acres 7 $1,750 <br /> Spread topsoil on reclaimed azea 7.0 acres @ 2 <br /> inches average thickness (2000 cy). Use D-8 <br />4 w/universal blade. Cost is $0.52/c . 5 $1,040 <br /> Final grading and harrowing of topsoil, upper zone <br />5 onl , (2000 c $0.38/c ). 7 $760 <br /> Seed, mulch, fertilize (7 acres@ $750/acre) Drill seed <br />6 on flat areas. Mulch at 40001bs er acre. 10 $35,180 <br /> Seed, mulch, fertilize (0.25 acres@ $1100/acre) Drill <br />7 seed on flat areas. Mulch at 40001bs er acre. 2 $6,860 <br /> Total Direct Costs 64 da s $42,040 <br />Anderson Pit February OS L-1 <br />