Laserfiche WebLink
PERIODIC INSPECTION FORM <br />Stockponda or Sumpa <br />INSPECTOR'S NAME: Roy Karo <br />FACILITY CONFIGURATION: Stockoond <br />SITE NAME: T-7 <br />MINE NAME: Seneca II-W <br />MINE I.D. NO.: C-82-057 <br />DATE: 12/17/96 <br />DATE LAST INSPECTION: 09/28/96 <br />LOCATION: SEyNWY. Sec 22, T5N. RSSW <br />LOCATION: 8 mi S of Hayden. CO <br />OWNER'S REP.: Brad Brown. Gen Mar <br />Circle or write in aoorooriate resoonae <br />1. Angle of slope: 3:1 upstream, 3:1 downstream Total = 6:1 N/A <br />2. *Seepage (specify location, color, and approximate volume) <br /> At isolated points on embankment slopes: Yes N/A <br /> At natural hillside: Yes N N/A <br /> Over widespread areas: Yes No N/A <br /> From downstream foundation area: Yes o N/A <br /> "Boils" beneath stream or ponded water: Yes o N/A <br />3. Cracks or scarps on crest: Yes o N/A <br />4. Cracks or scarps on slope: Yes N/A <br />5. Sloughing or bulging on slope: Yes o N/A <br />6. *Major erosion problems: Yes o N/A <br />7. Surface movements in valley bottom or on hillside: Yes o N/A <br />8. *Erosion of toe: Yes N/A <br />9. *Water impounded against downstream toe: Yes N(A <br />10. Existing embankment freeboard: Aooroximately 1 feet <br />11. X Increase Decrease in water level: 2 feet <br />12. Cracks, bulging, or erosion on upstream face: Yes o N/A <br />13. Spillway erosion: Yes No N/A <br />14. *Clogginq <br /> Spillway channels: Yes N/A <br /> Diversion ditches: Yes ~ <br />o N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the space on the back of this sheet. <br />