My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58024
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:21 PM
Creation date
11/20/2007 5:39:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002110
IBM Index Class Name
Permit File
Doc Date
11/19/2002
Doc Name
Final Reclamation Cost Estimate
From
DMG
To
Lewicki and Associates
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ClRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 11/19/2002 <br />User: GRM <br />State :Colorado <br />County :Mesa <br />Site :19 Road Gravel Pit <br />Permitfjob# :M-2002-110 <br />Abbreviation :none <br />Filename : M110-003 <br />Agency or organization name : DMG <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description :Spread and grade overburden to establish <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R - 8SU Horsepower : 305 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no: 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $49.50 NA <br /> Operating cosUhour : $85.98 100 <br /> Ripper op.cosUhour : $1.87 25 <br /> Operator cosUhour : $27.99 NA <br /> Total unit cosUhour : $145.35 Tota l fleet cosUhour : $145.35 <br /> <br />.,: z~ ` <br />. , <br />m <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 25,800 LCY factor : NA volume: 25,800 LCY <br /> <br />Source of estimated volume :accepted application volume <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors - Source <br />Average push distance : 60 feet <br />Unadjusted howdy production : 1,246.9 LCY/hr <br />Material consistency description <br />Loose stockoile <br />Average push gradient : 16.50 % (neg) <br />Average site altitude : 4,475 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Operator skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : f.36 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.70 <br />Adjusted unit production <br />Adjusted fleet production <br />878.51 <br />878.51 <br />LCY/hr <br />LCY/hr <br />Fleet size : 1 Dozers) Total job time : 29.37 Hours <br />Unif cost : $0.165 /LCY Total job cost : $4,269 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.