Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />999 <br />EXHIBIT A - Legal Description ~~~, ~~~ <br />~.. <br />ot~•. <br />The Northwest Quarter of the~Southwest Quartei~f Se iorzF, , <br />Township 6 North, Range 70 West of the 6th P,M. Ex~p~ to `y,;., <br />tracts of land conveyed in Warranty Deeds recorded iak,'$pokr1502.<-=;; <br />at page 447 and in Book 1511 at page 65, County of La3:ir4er;~'Stat.e~• <br />of Colorado. ~ -~,; <br />__ 6~ ~ <br />EXHIBIT B ':~1 <br />~.". <br />u~. <br />1, All aspects of the mine including the quarry, `rtackpile <br />and equipment areas are included in the permit area, T1~&~tock <br />piled top soil is on the same piece of property, but it `is down <br />right next to the county roads. Th,-, hH~ }7~e., ~~,~i'~it'v< s'~=~~*I~c <br />fee e~rtir+1 M+ Ce e.. r} 1}~Y('~~ <br />2, No. The preexisting quarry has not been e~nfarged. iVe <br />will work only in the existing disturbed area. We do not plan on <br />en argement at t is time, <br />3. Yes. Some top soil has' been stored on the site on the <br />southwest side, <br />4. No. <br />5. The top soil that is off-site is a big pile of top soil <br />that has been there for a long time. We don''t even know when tt <br />was put there, We will not be taking any top soil from there <br />other than the existing pile. Ne think't}iis top soil was piled <br />there when they terraced the orchard below the pile. We will not <br />disturb the existing top soil depth, To remove this top soil we <br />will use a track loader and return the site to its normal grade. <br />6. Yes we have the owners approval. The area is not <br />undisturbed as described in Exhibit R, No. 5, <br />7, The top soil is so far away it would not be practical to <br />include it in the permit area. It is down towards the main gates <br />almost to the county road, }~;y ~,r r., :5 ,r,l~.l P~~ z~'~~eG "r # / nl)c.~ <br />8. We will mine approximately lit in the direction of the <br />site, <br />9, We intend to back fill with overburden so it will not be <br />necessary to bench the fiigfiwalls. IF it is needed we would bench <br />any areas that would be higher than the backfilled area. <br />10, We will be pushing all our rubble to the east into an old <br />existing quarry. This will be reclaiming an old quarry that we <br />had nothing to do with. <br />11. Our access road and all the Toads are preexisting roads. <br />If we develop any roads they would be inside the permit boundry. <br />. ~ EXHIBIT C G~ <br />See map included with this paperwork. <br />O <br /> <br /> <br />yI <br />:. <br />. <br />~ .. ~. <br />