Laserfiche WebLink
Mine Area Seneca II <br />Project Topsoil Replacement <br />Task Replace Topsoil All Areas <br />WORKSHEET N0. TS-1 <br /> PRODUCTIVITY FOR SCRAPER USE <br />Eerthmoving Ac tivity: Replace 1.0 feet of topsoil on mine area, including roads <br />Scraper Used: 637E Push-Pull <br />Scraper Route Etc. See FPC Worksheets <br />Volume: 933.995 ccy <br /> 1.140.380 lcy (hauled) <br />Cycle Time = 1.0 Load + 0.6 Maneuver + Trip Time = Lycle Time (see FPC <br /> Worksheets) <br />Hourly Product ion = See FPC 4orksheets <br />Volume = 1 <br />175 <br />895 t <br /> . <br />. <br />ons <br />Hours Required = 1031 (fleet of 4) <br />Cost Per Hour = E861.79 (includes blade and water wagon) <br />Total Cost - 1031 hrs. x 861.79 cost/hr = 5888.502 <br />REFERENCES: (See FPC Worksheets for all Factors) I <br /> Attachment 13-6 O <br />a$I~ <br /> Table 13-2-6 <br /> Attachment 13-2 <br /> a ds <br />a <br /> Ilry ~r~l. <br /> <br />