Laserfiche WebLink
• reclamation costs, EFCI, in compliance with applicable regulations, will increase or <br />supplement the extsting bond [o reflect estimated incremental costs poor to initiating <br />proposed changes. <br />Removal of Structures and Faalities <br />All existing mine structures and facilities will be utilized and remain in-place until <br />mining operations for the Southfield Mine have been completed. At that time any <br />structures facilities, and use azeas not approved for retention to support the <br />postmining use will be salvaged or demolished in order to reclaim the site and <br />establish proposed postmining land uses. It is antiapated that much of the equipment <br />utilized at the mine including conveyor systems, rotary breaker, process equipment, <br />storage hoppers, and [tuck scales, along with a number of pre-fabricated steel building <br />can be salvaged for continuing benefiaal use at the end of the mine life. Any <br />remaining equipment not salvaged will be dismantled, and any building or structures <br />which will not be retained and cannot be salvaged will be demolished. Equipment and <br />Facilities to be salvaged will be dismantled and hauled from the site by EFCI or private <br />• salvage contractors. Disassembly and demolition of remaining equipment and <br />structures will involve cutting steel structures and other large components into pieces <br />which can be readily handled by mobile equipment breaking-up foundation slabs and <br />masonry structures, and removing foundations and utilities to at least two (2) feet <br />below the natural ground surface. Resulting demolition debris will be loaded and <br />placed in appropriate disposal areas where it will be effectively covered by backfilling <br />and grading operations with a tnirumum of four (4) feet of suitable material. <br />All concrete will be broken up just enough so that it may be moved. All concrete <br />debris will be disposed of in low azeas of the facility site, and boned. The low azeas <br />include the azea in front of the portals (if portal structures aze not retained) and the <br />Pond 1 basin azea. The concrete will be cazefully place so as not to create any voids <br />which may cause slumping once backfilling is completed. All concrete debris will be <br />covered with at least 4 feet of backfill material. Demolition debris from the south <br />mine fan installation will be backfilled in the fan portal. <br />• <br />Minor Revision MR~1 2.05.47 Revised December 200] <br />