Laserfiche WebLink
<br />EXHIBIT E - Reclamation Plan <br />Mining will be done with trucks and front-end loader in <br />the direction as shown in Exhibit C. Topsoil will be stock- <br />piled for future return to site. Following mining, banks <br />will be sloped to not steeper than 5:1 slopes, topsoil <br />replaced to depth of 8", compacted and seeded to cover crop <br />of forage sorghum in spring or early summer. Late fall or <br />early spring seeding of following or smaller mixture will <br />be seeded. <br />Specie Variety IIPLS/Ac <br />Little bluestem Postura 1.75 <br />Sidecoats groma Vaughn 2.25 <br />Sand bluestem 4.00 <br />Switchgrass Nebr. 28 1.25 <br />Blue Grama .2~ ~ <br />Fertilizer will be applied at the rate of 40If available <br />N at seeding of cover crop and again at seeding of permanent <br />grass. Area should be fenced to give grazing control. <br />