Laserfiche WebLink
PBRIODIC INSPECTION FORM <br />8tockponds or Bumps <br />INSPECTOR' S NAME: °^~.1Care pp~TE; 06/29/99 <br />FACILITY CONFIGORATION: Stoc pond DATE LAST INSPECTION: 03/249 <br />SITE NAME: T-4 LOCATION: AN3~NF.3t,, Aec 11~ TSNf RA7N <br />MINE NAME: Aeneca ii LOCATION: 7_t mi AS of Hayden CO <br />MINE I.D. NO.: C-AO-006 OWNER'S REP.: Brad Arewn. C-en Nar <br />1. Anqle of elope: 3:t upstream, 2_scl downstream Total = s_se1 N/A <br />2. *Seepage (specify location, color, and approximate volume) <br /> At ieolnted points on embanlcaent elopes: Yee ~ N/A <br /> At natural hillside: Yee ~ N/A <br /> Over widespread areas: Yee ti~o N/A <br /> Prom downstream foundation area: Yee ®o N/A <br /> "Boils" beneath stream or ponded water: Yee ~ N/A <br />3. cracks or scarps on crest: Yee ~ N/A <br />4. Cracks or scarps on elope: Yee ~ N/A <br />5. Sloughing or bulging on elope: Yae ~ N/A <br />6. *Major erosion problems: Yee ®o N/A <br />7. Surface movements in valley bottom or on hillside: Yee ® N/A <br />8. *Eroeion of toe: Yee !~o N/A <br />9. *Water impounded against downstream toe: Yee ® N/A <br />10. Existing embankment freeboard: A~nroximately ~_ feet <br />11. Increase Decrease in water level: No chanQ ~ feet <br />12. Cracks, bulging, or erosion on upstream face: Yee N/A <br />13. Spillway erosion: Yae o N/A <br />14. *Clogging <br /> Spillway channels: Yee N/A <br /> Diversion ditches: Yee ~ <br />o N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the apace on the back of this sheet. <br />