Laserfiche WebLink
PBRIODIC INSPECTION FONT( <br />Stockpond• or Suaps <br />INSPECTOR'S NAME: Boy Raro <br />FACILITY CONFIGURATION: Stneknnnd <br />SITE NAMB: T-26 f <br />MINE NAME: Senecw TT <br />MINE I.D. NO.: _ C-80-OD5 <br />DATE: 06/~/aQ <br />DATE LAST INSPECTION: 03/26/99 <br />LOCATION: SWlrNS3~ ce , TSN_ RA7W <br />LOCATION: 7.1 m1 AA of Hwydgn, CO <br />OWNER'S REP.: Brad Arorm C-en MQ~ <br />1. Angle Of elope: 3:1 upstream, a.1 downstream Total = 7:1 N/A <br />2. *Seepage (specify location, color, and approximate volume) <br /> At isolated points on embankment elopes: Yee No N/A <br /> At natural hillside: Yee No N/A <br /> Over widespread erase: Yee No N/A <br /> From downstream foundation area: Yee No N/A <br /> "Soils" beneath stream or ponded water: Yee No N/A <br />3. Cracks or scarps on treat: Yee No N/A <br />4. Cracks or scarps on elope: Yee No N/A <br />5. Sloughing or bulging on elope: Yee No N/A <br />6. *Major erosion problems: Yee No N/A <br />7. Surface movements in valley bottom or on hillside: Yee No N/A <br />8. ^Eroeion of toe: Yee No N/A <br />9. *Water impounded against downstream toe: Yee No N/A <br />10. Existing emban7®ent freeboard: Approximately _1_ feet <br />11. increase Decrease in water level: Ao chwnQe feet <br />12. Cracks, bulging, or erosion on upstream face: Yee No N/A <br />13. Spillway erosion: Yee No N/A <br />14. *clogging <br /> Spillway channels: Yee No N/A <br /> Diversion ditches: Yes No N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the apace on the back of this sheet. <br />