My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25500
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:14 PM
Creation date
11/20/2007 5:37:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
7/26/1999
Doc Name
2nd Qtr 1999 Inspections
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Btockpoads or Sups <br />INSPECTOR'S NAME: Env Rare <br />PACILITY CONFIGURATION: ~ e. pond <br />SITE NAME: T-5 <br />NINE NAME: Seneea ii <br />NINE I.D. NO.: c-BD-ODE <br />1. <br />2 <br />DATE: n6;~f99 <br />DATE LAST INSPECTION: 03f26/99 <br />LOCATION: aW~NL3r exec ii TSN RB7W <br />LOCATION: 7_1 mi SR of Hw~d,an, c0 <br />OWNER'S REP.: Brad Brown, Gen Nqr <br />Angle of elope: 2:] upstream, a:1 downstream <br />*Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment elopes: <br />At natural hillside: <br />over widaeprend areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />3. Cracks or scarps on creel: <br />4. <br />5. <br />6. <br />7. <br />cracks or scarps on elope: <br />Sloughing or bulging on elope: <br />*Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />S. *Eroeion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: A~~rox imwtelX <br />11. Increase Decrease in water level: Ne ehange <br />12. Cracks, bulging, or erosion on upstream face: <br />13. Spillway erosion: ,_ <br />14. *Clogging <br />Spillway channels: <br />Diversion ditches: <br />Yee ~o N/A <br />Yee NO N/A <br />Yee Flo N/A <br />Yee ~ N/A <br />Yee ~ N/A <br />Yea ® N/A <br />Yee ~ N/A <br />Yee ~ N/A <br />Yee N® N/A <br />Yee ®° N/A <br />Yee ©o N/A <br />Yee ~ N/A <br />~ feet <br /> feet <br />Yee f~91 N/A <br />Yee ® N/A <br />Yee (Kp' N/A <br />Yee ~No N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent fot further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the apace on the back of this sheet. <br />Total = 6:1 N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.