Laserfiche WebLink
<br />TABLE OF CONTENTS <br />VOLUME VII - GEOTECHNICAL STUDIES <br />• <br />1. Introduction <br />2. Preliminary Geotechnical Enj neering Study -July 10, 1996 <br />3. Additional Geotechnical Study -Evaluation of Reclaimed Slopes -October 10, 1996 <br />4: Additional Stability Analyses -Road Cuts and Topsoil Pile -January 7, 1996 <br />5. Geotechnical Labo;atory Testing -Proposed Gob Pile -January 7, 1997 <br />6. Maps VII-1 & 2 Section & Bore Hole Locations <br />7. Expansive Soil Evaluation -Reclaimed Fill Slopes -January 31, 1997 <br />8. Additional Geotechnical Investigation -Coal Mine Waste Bank -February 12, 1997 <br />9, conL Go/vveyoQ SyS1EM - oc.7cst2 7, 194 g <br />10. Geotechnical Engineer Report -Slope Stability Analysis - PR-03 - Terracon - 6/2/99 <br />I!_ S6oimEnrf pavD Li -- SANVAR/yy zc Zoao <br />~ 2, B-Seam Portal and Stockpile - A FRiL 7~ aoo3 <br />A~PRov 60 <br />PR-07 s ~' Z~c3 <br />viii <br />4/03 <br />