My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE57880
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE57880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:13 PM
Creation date
11/20/2007 5:37:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982054
IBM Index Class Name
Permit File
Doc Date
11/18/1989
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECL,AFWTIBN COST SUMMARY cont'd <br />B. Portal/Shaft Sealing <br />ion <br />Sheet of Sheets <br />Subtotal <br />~.. <br />1 <br />C. Drill Hole/Monitoring Well Sealing <br />..s ri ~ roc -S rid ~ - <br />J > ~ /~t,o0 <br />Subtotal <br />D. <br />E. <br />F. <br />G. <br />rks <br />Reveaetation (total ..from worksheet) ~ I59.n77.3a <br />Fenci <br />lization Demobilization total from worksheet D. <br />TOTAL DIRECT RECLAMATION COSTS (items A through G) b 85?~l?7 99 <br />Profit <br />II. INDIRECT COSTS <br />A. Overhead any <br />. Public Liability Insurance - 0.825 of direc <br />. Contractor's Performance Bond - 0.805 of di <br />- O <br />3. Job Su erintendant total from worksheet - o - <br />4. Contractor's Profit - 105 'of direct costs -o ~ _ _ <br />Subtotal <br />._.......~ --r-_ _ <br />B. Engineering/Bid Spec./Contract Document Preparation Fees ** <br />4.255 of Contract Amount direct costs lus overhead 6 rofit .3 ~~ Sl µ Jr'S <br />C. CMLRD Project Management Expenses - S10/hr, x req. man hours ~ _ O <br />'' man ower costs for contract issuance 6 construction oversite <br />TOTAL INDIRECT RECLAMATION COSTS (items A throughe C) E'~~6~~• Y~ - <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs) S o 9 S 6 SQ• 3~ <br />ROUNDED TO E_ ,~,51 6 BO ~ <br />-~-~ <br />C• *Eliminate Job Foreman (,Tim Hendricks will be overseeing-oroiect) <br />No maA-hours required for contract issuance <br />B• ** Used 4.258 dlthpugh Bid Specs and Contract Document Preparation Fees would not be needed <br />,~ . <br />
The URL can be used to link to this page
Your browser does not support the video tag.