Laserfiche WebLink
ditch and drainage structures. Active use azeas will be graveled to control dust and drainage, other <br />disturbed azeas (including topsoil stockpiles) will be stabilized with temporary vegetation, and any <br />structures will be painted in neutral earth-tone colors to blend with the natural surroundings. <br />As shown on Map 23, additional entries will be driven at the back of the 18-Right gate road to the east to <br />connect with the ventilation shaft. These entries will be needed to maximize the efficiency of the <br />ventilation system. The entries will be driven in the same manner as is used in TCC's development work, <br />i.e. continuous miners and shuttle cars. <br />6-North Mains Ventilation Shaft (TROS-48, MR06-208, MR06-210) <br />An additional intake ventilation shaft is necessary to maintain effective ventilation of active mining areas <br />in the northwest mining district and future west mining district. The new ventilation shaft will be located <br />in Section 17, TSN, R86W on a ridge northwest of the Northwest Mains Ventilation Shaft and fan, as <br />shown on Maps 23 and 23B. <br />Developmenru construction, and installation of the intake ventilation shaft (Exhibit 49A, Figures EX49A- <br />F1 through F4 and Maps EX49A-M1 through M3) involve the following sequential activities: <br />• Completion of environmental and engineering investigations <br />• Placement of disturbed area markers <br />• Marking of wetland buffer zone <br />• Temporary drainage and sediment control measures <br />• Recovery and stockpiling of available topsoil <br />• Installation of drainage and sediment control structures <br />• Construction of an access road and site prepazation for shaft pad <br />• Drilling and casing of seven (7) boreholes for: <br />- 3 power boreholes <br />- 1 water borehole <br />- 1 air compressor borehole <br />- 1 rockdust borehole <br />- lbulk-material drop borehole <br />• Extension of power distribution line <br />• Construction of shaft collaz structure and temporary drilling equipment pad <br />• Conventional blind sink excavation and casing operations <br />• Erection of escape hoist/elevator buildings and equipment and installation offence(s) <br />• Installation and connection of escape hoist/elevator control equipment and systems <br />• Driving of additional entries to the south of the existing 6-North Main entries <br />• Final clean-up and dressing of roads and site pads <br />These activities aze briefly described in the following sections. <br />Site-specific investigations required for design and permitting of the new ventilation shaft included a <br />cultural resource survey of potential disturbance azeas, soil and foundation characterization asthe basis for <br />shaft pad and access road design, and completion of a wetland/AVF survey for the shaft pad and access <br />road. The cultural resource survey was conducted by Metcalf Archaeological Consultants, the engineering <br />soils characterization by Northwest Colorado Consultants, and the soils/wetland/AVF survey by Habitat <br />Management, as described in Section 2.04. <br />MR06-210 2.05 - 45.6a 08/l5/06 <br />