My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE57762
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE57762
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:07 PM
Creation date
11/20/2007 5:34:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001060
IBM Index Class Name
Permit File
Doc Date
6/26/2001
Doc Name
PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />3B Enterprises <br />Deakins Pit <br />RECLAMATION COST ESTIMATE <br />EXHIBIT "D-1" <br /> <br />July 21, 2001 <br />The following costs relate to the reclamation plan of the Deakins Pit <br />site section 6, TbN, R90W Moffat County. Assuming both phase I and <br />II are in operation. <br />1) Replacement of b" - 12" of topsoil across disturbed area from <br />berms and to level out berms to original ground level (6,000 <br />yards of topsoil @ 1.08/yard = $6,480.00, per S & K Construction <br />which includes fuel and operator. <br />2) Grass seed mix (see attached for type), _ $381.00, per MJK <br />Sales and Feed. Trees (see attached for type), _ $560.00, per <br />Soils Conservation office. <br />3) Planting of seed = $1,500.00, per Jim Showalter, which includes <br />tractor, disc, harrow, drill, fuel, and operator. <br />4) Miscellaneous clean-up = $1,000.00. <br />NOTE: The cost estimate from the Mined Land Reclamation <br />Board of a total of $13,502 seems reasonable to me and <br />a bond for that amount would be obtained by 36 Enterprises <br />upon approval of permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.