Laserfiche WebLink
<br />EXHIBIT C - Ma <br />-3- • <br />This map should clearly define the permit boundaries and contain sufficient information <br />to determine the location of the affected land on the ground and existing and proposed <br />roads or access routes to ;~e used in connection with the mining operation. AZZ <br />immediately adjacent landrnoners of record must be shown. The quarter section corner, <br />section line, or any other locatable points should also be shown on this map. <br />EXHIBIT D - Wildlife, Water Resources, Vegetation and Soils Information <br />Each of the above-men tioneci subjects must be addressed as outlined in the applicable <br />RULE. <br />EXHIBIT E - Reclamation Plan <br />As with ithe mining plan, this should be a general discussion of the methods, equipment, <br />phases or stages of the reclamation process and those portions of Zand affected by each. <br />If possible, the plan should be closely correlated with the map. If not, the narrative <br />must be comprehensive enough to draw an accurate verbal picture of the expected appear- <br />ance of 'the area after completion of reclamation. <br />EXHIBIT F - Proof of Compli.snce with Local Government Zoning <br />In accordance with 34-32-IZ.i(4)(e), the Board must make a finding that the operation <br />will be in compliance with .local zoning or subdivision regulations. You are not <br />required to submit this information, but a submission would assist the Division's pro- <br />cessing of the application. When the Division notifies the local government of the <br />existence of this application, it will request information regarding compliance with <br />applicable Ioca1 law. It is intended that operators may concurrently come into compli- <br />ance with Ioca1 requirement:r at the same time the Division is processing this applica- <br />tion. Information regardinc the status with local government will be helpful. <br />EXHIBIT G - Source of Legal Ri aht to Enter <br />This couIid be a copy of the lease, deed, abstract of title, or current tax receipt. <br />An acceptable alternative would be a statement acrnowledged by a notary public that the <br />operator has the Legal right to enter and mine. <br />EXHIBIT H - Reclamation Costs <br />For a ILO permit, if the ope.cator requests financial warranty to be Less than $5,000.00, <br />the operator must submit facts to support such a request. Otherwise, a financial warranty <br />of $5,000.00 will automatically be set. For all 111 permits, the financial warranty shah <br />be $2,500.00 per acre. <br />EXHIBIT I - Terms of Governmental Contracts III1 Applications only) <br />For Special 10-Day (IlI) permits, the operator must submit a copy of the contract or <br />other proof that proves the r:ecessity of a special 20-day permit. The operator must also <br />submit evidence of the financial warranty provided under the governmental contract, if <br />it was required. <br />